Miami Pre-Construction Condos and New Developments

New developments are where a large share of Miami's condo demand lands first. Buyers reserve years before a tower is finished, usually at pre-completion pricing and on deposit schedules you will not see in the resale market.

I represent buyers on pre-construction directly. Whether you are looking at it as a primary residence, a second home, or an investment you plan to rent or resell later, the reservation terms, the deposit structure and the developer's track record matter as much as the unit itself. Below you will find a live search tool for new-construction inventory, and beneath it my own verified list of every Miami condo project currently selling off plan, with the ones carrying a status note called out separately.

Miami has more condo towers selling off plan than any other US market, and the public information about them is unusually bad. Aggregator sites list buildings delivered years ago as still selling, carry unit counts that differ by thirty units from one page to the next, and quote delivery years that passed before the project broke ground. At least one lists a tower that was cancelled outright.

The list below is my own, compiled from developer materials, The Real Deal, Florida YIMBY and trade press. Where sources disagree I show the range instead of picking one. Where I could not verify something the field is blank. I do not publish a number I cannot show you the source for.

Worth reading before you go deep on any single project: how deposit schedules work, the contract clauses that matter, pre-construction versus resale, and financing options.

Pre-construction in Miami: what buyers actually ask

What does pre-construction actually mean in Miami?

You are buying from the developer before the building exists, on a contract and a deposit schedule rather than a mortgage. You reserve, sign a purchase agreement, and pay deposits against construction milestones. You do not own anything until closing, which is typically two to five years out. In exchange you get first choice of line and stack, and pricing set before the building is standing.

How do deposit schedules work on a Miami pre-construction condo?

The most common Miami pattern is 20 percent at contract, 10 percent at groundbreaking, 10 percent at top-off and the balance at closing. It is not universal. Across the projects tracked on this page the entry deposit ranges from 10 percent to 30 percent, and the share due before closing ranges from roughly 30 percent to 50 percent. Two projects at similar prices can demand very different cash over the same three years, which is worth comparing before you settle on a floor plan.

What happens to my deposit if a project stalls or is cancelled?

Florida requires developer deposits on residential condominium sales to be held in escrow, and the purchase agreement sets the conditions for release and refund. That is the protection that matters most, and confirming it in writing is the first thing to do before signing. Projects do stall. This page flags the ones where the public record shows foreclosure litigation, a paused financing package, or a launch that has not produced signed contracts.

Can I resell a pre-construction unit before closing?

Sometimes, and the contract decides. Many Miami developer agreements restrict or prohibit assignment before closing, or allow it only with developer consent and a fee. If your plan depends on assigning the contract rather than closing on the unit, that clause is the entire deal and it needs reading before you sign.

Is pre-construction a better buy than resale in Miami?

Different risks rather than strictly better. Pre-construction gets you a new building, developer warranties and a payment runway, but you commit years ahead of delivery and cannot inspect what you are buying. Resale gets you a known building with known reserves, known HOA dues and a known recertification status, which after 2021 is not a small thing. Which fits depends on your timeline and how much uncertainty you want to carry.

Can a non-resident or foreign national buy pre-construction in Miami?

Yes, and a large share of buyers on these projects are. There is no citizenship or residency requirement to own Florida real estate. What differs is the paperwork - financing terms for foreign nationals, tax identification, and the withholding rules that apply when you eventually sell. Those are mechanical and solvable, but they are far easier to set up early than at closing.

Search new-construction inventory

Inventory and pricing in the tool update automatically. Any inquiry you send comes straight to me, not a call center.

Every currently-selling Miami pre-construction condo, by neighborhood

82 projects in pre-construction or under construction and selling as of 13 August 2026. Sold-out projects are not listed. A blank field is unverified, not zero.

Brickell (18)

ProjectAddressDeveloperUnits / FloorsDeliveryFromStatus
2200 Brickell2200 Brickell AveAria Development Group + Largo + Place Projects105 / 5Summer 2026$830K-$1.2MWeeks from completion Jul 2026, 85% presold
619 Brickell by Nobu619 Brickell Ave13th Floor Investments + Key International296-306 / 74-752030$2.9MPre-construction, sales launched Jun-Jul 2026
Deposit schedule: 15% contract / 15% groundbreaking / 10% at 1yr / 60% closing
888 Brickell by Dolce&Gabbana888 Brickell AveJDS Development + GV Development259 / 90Q2 2029$2.5MPre-construction
Deposit schedule: 20% contract / 10% groundbreaking Q2 2026 / 20% top-off Q4 2027 / 50% closing
Baccarat Residences Miami444 Brickell AveRelated Group + GTIS Partners360 / 75-77Early 2028$1.1MUnder construction, ~78% sold
Cipriani Residences Miami1420 S Miami AveMast Capital397-405 / 802027-2028$1.8M-$2.34MUnder construction, topped out Apr 2026, >75% sold
Deposit schedule: Reservation $100-250K, balance of 20% at contract / 10% groundbreaking / 10% rooftop
Colette Residences1880 Brickell AveMETA Development38 / 52028$2.79M-$3.3MPre-construction, groundbreaking 2026
Domus Brickell Center1034 SW 2nd AveNorth Development (Edifica + Oak Capital)579 / 352027-2028$520KUnder construction (broke ground 2025)
Deposit schedule: 30% total in deposits (milestone split not published)
House of Wellness Brickell152 SW 9th StNorth Development (Oak Capital + Edifica)656 / 33-34Q1 2030$390-420KPre-construction, sales launched Feb 2026
Deposit schedule: 10% contract / 5% at 2mo / 5% at 4mo / 5% at 6mo / 15% groundbreaking / 60% closing
Lofty Brickell99 SW 7th StNewgard Development + Two Roads362 / 44Aug 2027$500KUnder construction, topped off Jun 2026
Deposit schedule: 10% + 10% (aggregator only)
Melia Miami Brickell1136 SW 3rd AveUrban Network Capital Group111 / 8Q1 2027$548KTopped off May 2026
Mercedes-Benz Places Miami1 Southside Park / 1133 SW 2nd AveJDS Development (Fontainebleau partnership pending)791-1195 / 60-672030$500-685KSTALLED - $100M foreclosure suit Apr 2026
Millux Place Miami239 SW 12th StHabitat Group + BI Group99 / 8-92026-2027Pre-construction / pre-launch
ORA by Casa Tua1210 Brickell AveFortune International Group540 / 76Apr 2029$950KPre-construction, 45% reserved (Oct 2024)
Deposit schedule: 20% contract / 20% groundbreaking / 10% at 10th floor / 50% closing
One Twenty Brickell Signature Residences120 SW 8th StPMG467 / 402029$650KSales launched Apr 2026
Parkside Residences at Brickell1741 SW 2nd AveHabitat Group + BI Group185-187 / 7-82027-Q2 2028$435KUnder construction, broke ground Apr 2026
Deposit schedule: 20% contract / 10% groundbreaking / 10% top-off / 60% closing; 10% reservation
The Residences at 1428 Brickell1428 Brickell AveYtech189 / 70Late 2026-early 2027$2,675,900Under construction, topped out Q1 2026, ~85% sold
Deposit schedule: 20% contract / 10% groundbreaking / 10% top-off / 60% closing
The St. Regis Residences Miami1809 Brickell AveRelated Group + Integra Investments152 / 502027$4.6MUnder construction, >80% sold (~$900M)
Deposit schedule: 20% contract + 10% at milestones (aggregator only)
The Standard Residences Brickell99 SW 7th StNewgard + Two Roads + Midtown Development407-422 / 45-46Aug-late 2027$600KUnder construction, topped off Jun 2026
Deposit schedule: 10% down to start; up to 70% financing available

Brickell Key (1)

ProjectAddressDeveloperUnits / FloorsDeliveryFromStatus
The Residences at Mandarin Oriental Miami500 Brickell Key Dr / 1 Island DrSwire Properties + Mandarin Oriental228 S + 98 N / 52-662028-2030$3.9M-$6.6MPre-construction, groundbreaking fall 2026
Deposit schedule: 20% contract / 10% groundbreaking / 10% top-off / 60% at delivery

Downtown Miami (4)

ProjectAddressDeveloperUnits / FloorsDeliveryFromStatus
Delano Residences Miami400 Biscayne BlvdPMG (with Ennismore/Accor)421 / 902030-2031$725K suites / $1.46M 1BRPre-construction, sales launched Feb 2026
Deposit schedule: 10% contract / 10% Oct 2026 / 10% groundbreaking est Jun 2027 / 10% 1yr later / 60% closing
JEM Private Residences1016 NE 2nd AveNaftali Group274-278 / 65-67Q2-Q4 2027$600KUnder construction, vertical complete
Deposit schedule: 20% contract / 10% at 90 days / 10% Summer 2026 / 60% closing
Okan Tower555 N Miami AveOkan Group163 + 236 + 14 / 70-722027-2028$680KUnder construction, 50th floor / ~75% structural Apr 2026
Waldorf Astoria Residences Miami300 Biscayne BlvdPMG + Greybrook Realty Partners360 / 10020291BR sold out; 2BR $3.3MUnder construction, passed 60th floor Feb 2026
Deposit schedule: 20% contract / 10% at 30 days / 10% at 90 days / 10% at 1yr / balance closing

Park West (2)

ProjectAddressDeveloperUnits / FloorsDeliveryFromStatus
E11EVEN Club Residences Beyond40 NE 11th StPMG + E11EVEN Partners469-558 / 652027Under construction, upper levels
Palm Tree Residences Miami31 NW 10th StPMG + Lion Development + Eden Residential + Sterling Equities480-483 / 372030$500-550KPre-construction, launched May 2026, groundbreaking Apr 2027

Arts & Entertainment District (2)

ProjectAddressDeveloperUnits / FloorsDeliveryFromStatus
14 ROC Miami125 NE 14th StGFO Investments283 / 31-322027-2028$509-590KUnder construction, broke ground Jun 2026 at 50% sold
Deposit schedule: 20% contract / 10% at 3mo / 10% at 6mo / 10% at 1yr / 50% closing
Casa Bella Residences by B&B Italia1444 Biscayne BlvdRelated Group317 / 56June 2026Topped off Jul 2025

Edgewater (8)

ProjectAddressDeveloperUnits / FloorsDeliveryFromStatus
Aria Reserve North Tower700 / 725 NE 24th StMelo Group399 / 62Q2-Q3 2026Topped off Jul 2025, nearly complete Apr 2026
Cove Miami456 NE 29th StSB Development + Hazelton Capital Group134 / 40Q1 2028$900KsUnder construction, broke ground Mar 2026
Deposit schedule: 10% reservation / 10% contract / 10% groundbreaking / 10% top-off / 60% closing
ELLE Residences Miami3618 NE 5th AveVertical Developments + Urban Network Capital Group180-189 / 25-262028$525KPre-construction, groundbreaking expected 2026
Edge House Miami1837 NE 4th AveGrupo T&C (Meridian TC)608 / 57Late 2028$500KUnder construction, foundation work
HQ Residences Miami422 NE 29th StBlack Salmon + The Boschetti Group + Constellation Group229 / 352029$850KPre-construction, groundbreaking expected Q3 2026
LILLI Miami Edgewater717 NE 27th StOKO Group117 / 532029-2030$1.65MSales launched May 2026, reservations open
Spectre Miami2731 NE 2nd AveMartinez Developments138 / 242028Pre-construction, early-access reservations
Villa Miami710 NE 29th StTerra Group + One Thousand Group + Major Food Group64-70 / 55-56Late 2027$5.5MUnder construction, 37th floor May-Jun 2026

Midtown (1)

ProjectAddressDeveloperUnits / FloorsDeliveryFromStatus
Midtown Park Residences by Proper2901 NE 1st AveRosso Development + Midtown Development + Proper Hospitality288 / 282028mid-$600KsPre-construction, sales gallery open

Midtown / Design District (1)

ProjectAddressDeveloperUnits / FloorsDeliveryFromStatus
Jean-Georges Miami Tropic Residences3501 NE 1st AveTerra + Lion Development Group329-338 / 492028-2030$1.0-1.1MPre-construction, selling
Deposit schedule: 10% contract / 10% at 90 days / 10% groundbreaking / 10% top-off / 60% closing

Design District (2)

ProjectAddressDeveloperUnits / FloorsDeliveryFromStatus
Kempinski Residences Miami Design District3801 & 3883 Biscayne BlvdDaGrosa Capital Development Partners132 + 6 TH + 17 suites / 20 x2Q4 2029$3.7MPre-construction, selling
Miami Design Residences by Fouquet's39 NE 39th StMiami Design District Associates + Fort Partners + Raycliff + Constellation Hotels143 + 20 / 252030$1.8MSales launched Apr 2026

Wynwood (5)

ProjectAddressDeveloperUnits / FloorsDeliveryFromStatus
DUOS Wynwood335 NW 28th StWave Group + Vitrium Capital + Zambala49 / 82028-2029$500KSales launched Apr 2026, construction late 2026
Frida Kahlo Wynwood Residences119 NW 29th StPMG + LNDMRK Development244 / 8 + 142028-2029$500-550KPre-construction, sales launched Jan 2026
The Cloud One Hotel & Residences Wynwood2215 NW 1st PlMotel One Group85-87 / 82027-2028Pre-construction, selling
The Rider Residences94 NE 29th StRilea Group + Cipres146 / 122027$650KUnder construction, ~50% presold
Twenty Sixth & 2nd Wynwood Residences2600 NW 2nd AvePMG + LNDMRK Development233 / 8-9Q2 2028$495-500KUnder construction, 73% presold
Deposit schedule: 10% contract / 10% at 90 days / 10% groundbreaking Feb 2026 / 10% Feb 2027 / 60% closing

South Beach (2)

ProjectAddressDeveloperUnits / FloorsDeliveryFromStatus
Shore Club Private Collection1901 Collins AveWitkoff + Monroe Capital49 + 75 keys2027$6.0MUnder construction, permit Aug 2026
The Ritz-Carlton Residences South Beach1671 Collins AveCONTESTED: Sobe Sky Development vs Related+Lionheart30-56 / 15-192027$2.0MPre-construction

Mid-Beach (3)

ProjectAddressDeveloperUnits / FloorsDeliveryFromStatus
Casa Cipriani Miami Beach3611 Collins Ave13th Floor Investments + Midtown Equities23 + 36 keys / 17-192027Proposed / pre-construction, 19-story plan filed Apr 2026
The Perigon Miami Beach5333 Collins AveMast Capital + Starwood Capital72-73 / 172027$12.55MTopped off Mar 2026, approaching sellout
Twenty-Nine Indian Creek2901 Indian Creek DrJMH Development11 / 72027$1,595,000Pre-construction

North Beach (6)

ProjectAddressDeveloperUnits / FloorsDeliveryFromStatus
72 Carlyle600 & 650 72nd StLefferts134 / 19-202027-Fall 2028$995KPre-construction
7200 Collins7200 Collins AveNorthlink Capital222 / 122027-Q1 2028$550-600KUnder construction, broke ground Mar 2026
Deposit schedule: 20% contract / 10% groundbreaking / 10% top-off / 60% closing
Ella Miami Beach6940 Abbott AveConstellation Group + The Boschetti Group + Vietmar103 / 10Early 2027$480-600KTopped off Mar 2026, ~70% sold
NoBe PARC Miami Beach7140 Abbott AveRobert Finvarb Companies232 / 15Q4 2028$570KSales launched May-Jun 2026
Ocean Terrace740 Ocean TerraceWitkoff Group + Ocean Terrace Holdings52 + 24 + 42 keys / 202029$6.3-6.9MSelling, launched Oct 2025 with $200M+ presales
Palma Miami Beach Residences600 71st StLefferts126 / 142027$650KUnder construction, broke ground Dec 2025

Bal Harbour (1)

ProjectAddressDeveloperUnits / FloorsDeliveryFromStatus
Rivage Bal Harbour10245 Collins AveRelated Group + Two Roads Development + Rockpoint56-88 / 24-25Dec 2027$8.0MUnder construction, groundbreaking Sep 2024

Surfside (4)

ProjectAddressDeveloperUnits / FloorsDeliveryFromStatus
Ocean House Surfside9317 Collins AveMultiplan Real Estate Asset Management25-27 / 6-122027$5.0-10.0MUnder construction, broke ground Feb 2025
Surf House at The Surf Club8955 Collins AveFort Partners17 / 11$8.5MUnder construction, $110.7M financing secured
Surf Row Residences8800 Collins AveLD&D + ONE Capital + IGEQ24-25 / 32027$1.375-1.4MUnder construction, broke ground Nov 2025
The Delmore8777 Collins AveDAMAC International37 / 122029$15.0MRISK: sales relaunching, ZERO contracts signed as of Apr 2026

Sunny Isles Beach (2)

ProjectAddressDeveloperUnits / FloorsDeliveryFromStatus
Bentley Residences18401 Collins AveDezer Development216 / 622028$5.8MUnder construction, ~13 stories Jul 2026
Deposit schedule: 10% reservation / 10% purchase agreement / 10% groundbreaking / 10% at 28th floor / 10% top-off / 50% closing
The St. Regis Residences Sunny Isles Beach18801 Collins AveChateau Group + Fortune International Group320 (170 S / 150 N) / 62S 2028 / N 2029$5.0MUnder construction, South nearly sold out, NORTH TOWER now selling
Deposit schedule: 30% contract / 10% at 12 months / 10% at 40th floor pour / 50% closing

Aventura (4)

ProjectAddressDeveloperUnits / FloorsDeliveryFromStatus
Avenia by FENDI Casa20605 NE 34th AveVertical Developments22 / 182026-early 2027$5.0-5.2MPre-construction, selling
Deposit schedule: 20% contract / 10% groundbreaking / 10% top-off / 60% closing
EDEN2557 NE 190th StGrowin Group32 / 10$570,000Under construction, broke ground Jun 8 2026
LEV2520 NE 191st StGrowin Group + Property Pros32 / 102028$570,000Under construction, broke ground Jul 2026
TAL Aventura2785 NE 183rd St2151 Development Group86-93 / 21-26RISK: taking reservations but no groundbreaking verified; 2025 target lapsed

North Bay Village (4)

ProjectAddressDeveloperUnits / FloorsDeliveryFromStatus
Continuum Club & Residences1755 79th St CausewayContinuum Company + Aksoy Holding198-236 / 32-36July 2028$938K-$1.25MUnder construction, ~50% presold
Deposit schedule: 20% contract / 10% at 120 days / 10% top-off / 60% closing
Pagani Residences Miami7940 West DrRiviera Horizons70 / 302027$3.9MUnder construction, groundbreaking May 2026
Deposit schedule: 20% contract / 10% groundbreaking / 10% amenity deck / 10% top-off / 50% closing
Shoma Bay1850 John F Kennedy CswyShoma Group333 / 21-282027$500-750KUnder construction since Oct 2025
Deposit schedule: 30% contract / 10% amenity deck / 10% top-off / balance closing
Tula Residences7918 West DrBayshore Grove Capital54 / 21Q4 2026-2027$2.0-2.4MUnder construction, selling
Deposit schedule: 20% contract / 10% at 6 months / 70% closing

Coconut Grove (5)

ProjectAddressDeveloperUnits / FloorsDeliveryFromStatus
Four Seasons Private Residences Coconut Grove2699 S Bayshore DrFort Partners + CMC Group70 / 20Q4 2028$5.6MUnder construction, selling
Deposit schedule: 20% contract / 10% groundbreaking / 10% top-off / 60% closing
OPUS Coconut Grove3137 SW 27th AveMETA Development14 / 62027$2.5MUnder construction, broke ground Apr 2026, ~60% presold
Deposit schedule: 20% contract / 10% groundbreaking / 10% top-off / 60% closing
THE WELL Coconut Grove2835 Tigertail AveTerra + AB Asset Management194 / 82028$1.5MUnder construction, broke ground Jan 2026, >50% presold
The Lincoln Coconut Grove2650 Lincoln AveLORE Development Group + Element Development48 / 82028$1.52MUnder construction, broke ground Jul 2026, ~40% presold
Deposit schedule: 20% contract / 10% groundbreaking / 10% at 5th-floor pour / 60% closing
Ziggurat Coconut Grove3101 Grand AveThe Allen Morris Company19 / 3Early 2028$3.5MUnder construction, NEARLY SOLD OUT Aug 2026

Coral Gables (7)

ProjectAddressDeveloperUnits / FloorsDeliveryFromStatus
Alhambra Parc33 Alhambra CirMG Developer + Vertical Developments74 / 112028$1.1MSelling, $100M construction loan Jun 2026
Deposit schedule: 10% reservation / 10% contract / 10% groundbreaking / 10% top-off / 60% closing
CORA Merrick Park4241 Aurora StConstellation Group + The Boschetti Group74 / 12-132028$900KsUnder construction, began Apr 2026
Cassia - The Residences at Coral Gables4011 Salzedo StAlta Developers174 / 122027$800KsUnder construction, selling
Deposit schedule: 10% contract / 10% at 60 days / 10% at 120 days / 60% closing
Ponce Park Residences3000 Ponce de Leon BlvdThe Allen Morris Company58 / 11Early 2028$2,455,000Under construction, broke ground Dec 2025
Deposit schedule: 5% reservation / 15% contract / 10% groundbreaking / 10% top-off / 60% closing
Seventeen Gables1715 Douglas RdBAM Development + Ascendra Capital117 / 82028$634,900Under construction, broke ground May 2026
Deposit schedule: 10% contract / 10% at 90 days / 10% at 180 days / 10% top-off / balance closing
The Avenue Coral Gables Hotel & Residences351 San Lorenzo AveRoger Development Group48-54 / 8-12UNRESOLVED: sources say presales / completed 2023 / under construction
The George Residences717 Valencia AveMG Developer13 / 3Q2 2027$6,275,000Under construction, broke ground Nov 2025

On deposit schedules: 34 of these 82 projects publish one. Developers generally keep payment terms out of public marketing - the schedule lives in the purchase agreement. Treat anything here as a starting point and confirm it against the contract.

Projects carrying a status note

These are selling, or presented as selling, but the public record shows something a buyer should know first. None of it means do not buy. It means ask one specific question before you do.

2200 Brickell - 2200 Brickell Ave

Reported as weeks from completion in July 2026 and roughly 85% presold. If a certificate of occupancy has issued, this is no longer a pre-construction purchase and the remaining inventory is standard new-construction closing. Verify TCO status before treating it as pre-construction.

Mercedes-Benz Places Miami - 1 Southside Park / 1133 SW 2nd Ave

A $100 million foreclosure action was filed against the development entity in April 2026. As of June 2026 the developer reported financing was being finalized with a new partner. Sales launched in 2024 and buyer deposits have been collected. Florida law requires pre-construction deposits to be held in escrow; confirm the escrow terms and the current status of the project in writing before signing anything.

Casa Bella Residences by B&B Italia - 1444 Biscayne Blvd

The tower topped off in July 2025 and was listed for a June 2026 delivery, but at least one industry outlet has reported the project paused on financing with a relaunch under discussion. I have not been able to confirm which is current. Verify status directly with the developer before relying on a delivery date.

Aria Reserve North Tower - 700 / 725 NE 24th St

Topped off in July 2025 and described as nearly complete in April 2026. It may already have delivered. Verify certificate of occupancy before treating this as a pre-construction purchase.

ELLE Residences Miami - 3618 NE 5th Ave

Delivery year appears as 2026, 2027 and 2028 across different sources, and the developer is variously credited to two different entities. Confirm the current timeline and developer of record directly.

The Ritz-Carlton Residences South Beach - 1671 Collins Ave

Two entirely different profiles for this project are in public circulation, disagreeing on developer, architect, unit count and floor count. I am not able to determine which is accurate. Every figure here should be confirmed with the sales gallery before use.

The Delmore - 8777 Collins Ave

Built on the former Champlain Towers South site. Sales launched in January 2025; as of April 2026 no contracts had been signed and the developer has publicly described the launch as premature while exploring joint-venture partners. The project is real and permitted, but it has not yet demonstrated sales traction.

TAL Aventura - 2785 NE 183rd St

The developer's site is still accepting reservations, but I found no evidence that construction has started and the original 2025 delivery target has passed. Unit count and floor count also differ between the 2022 approval and a 2024 revision. Treat any figure here as unconfirmed until the developer confirms in writing.

The Avenue Coral Gables Hotel & Residences - 351 San Lorenzo Ave

Status could not be resolved. Sources variously describe this as in presales, under construction with a 2025 delivery, and completed in 2023. Groundbreaking was November 2023. Confirm directly with Roger Development Group before acting on anything here.

Not sure which pre-construction projects fit your budget or timeline?

That is the conversation I have every week. Tell me what you are after and I will send you a shortlist worth looking at.

Get in touch